EIEC
EIEC
  • Home
  • About Us
  • Our Sectors
    • Fabrication Sector
    • Food & Beverage
    • Industrial Projects
    • Quality Inspection
  • RFQ
  • Our Projects
  • Contact Us
  • Our Clients
  • More
    • Home
    • About Us
    • Our Sectors
      • Fabrication Sector
      • Food & Beverage
      • Industrial Projects
      • Quality Inspection
    • RFQ
    • Our Projects
    • Contact Us
    • Our Clients
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • About Us
  • Our Sectors
    • Fabrication Sector
    • Food & Beverage
    • Industrial Projects
    • Quality Inspection
  • RFQ
  • Our Projects
  • Contact Us
  • Our Clients

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Our Projects

About Us

Danone Egypt Factory (El-Obour Factory)

Install a new mixing filler in a yoghurt filling Bosch machine and 

install the relative piping for the new filler 

PepsiCo Factory (El-Minya Factory)

  Install a new syrup room, consists of sugar dissolver area , CIP area , syrup storage area , Minor ingredients area and final syrup storage area.

El-Ahram beverage Factory (Abu-Hammad Factory)

  Install a new PET line 

The line consists of a blowing machine, filler, pasteurization furnace, dryer, labeler, shrinkage packer, palletizer, and conveyors.

Mazoon Dairy Factory (Sultanate of Oman)

  Assembly of a new area for treatment (separation, deaeration, homogenization, and heat treatment) of different products (milk, juice...). 

In addition to the installation of new equipment in this area, it is necessary to install new lines to connect it with the existing ones.

Challenger Yoghurt Filling Machine

 Fabrication and welding for the piping system for 16 cup yoghurt filling machine.  

PARIS OASIS WATER

  •  The site is situated 800 KM south of Cairo, 10  km south of Kharga Oasis 
  • PET line installation with KRONES  team 

New Process Pipes Rack, DANONE, Cairo

  •  Stainless Steel and carbon  steel pipes 
  • Steam & Condensate,  compressed air, city & process  water, chilled water supply &  Return 
  • Working closely with GEA to  supply their internal rack with  a/m utilities 

Yogurt fermentation tanks, DANONE, Cairo

  •  Purpose: to inject and connect a  new fermentation tanks in  Danone current process  through the roof in a tight area  without disturbing production 
  • Used tanks supplied from  Spain, steps involved: 

  1. Tanks Modification (legs,  bottom and upper dishes) 
  2. Tanks flipping and  positioning 
  3. Leveling and piping 


Copyright © 2023 EIEC - All Rights Reserved.

  • Home
  • About Us
  • RFQ
  • Contact Us

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept